Thursday 10 September 2020

Risk Assessment

I learnt to rate situations on risk level. As a group we looked at five different risk definitions, low, likely, possible, elevated, and extreme risk.

First we read a situation. Then we rated the situations. We rated from 1 - 5, one is low risk and five is extreme risk. 

Next we wrote the consequences for each situation. This means we listed everything that could have happened. 

Then we came up with different types of situations. We made three situations for the five different risks ratings. 

I learned that everything has a risk.

LI.to assess consequences.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.